List of test instruments and equipment required by the laboratory serial number name of test instruments required quantity unit specification model manufacturer test item remarks picture 1 jaw (universal material testing machine) 2 we-1000b
For a number of short axis material: 45# steel, manufacturing quantity: sixty thousand, according to the requirements of the drawings, the factory's delivery requirements on time delivery, reasonable price, the production of deposit according to the total
Tianjin Zhicheng tool company for many years nationwide recycling NC cutter blades, bearing!!! The company all the year round for the Tianjin, Beijing, Cangzhou, around the recovery of CNC cutting tools and CNC blade, cutting tool, measuring
Buy: to the copper two, metal products and stamping parts), number of level of 110 million, material: copper (T3), specifications: according to the requirements of the drawings processing and prices: the factory according to the order requirements and
High priced long-term acquisition of various types of to idle CNC tool imports (Santak, Mitsubishi, OSG, YAMAWA, Kyocera, Hitachi, mountain high, Toshiba, Sumitomo, big, NS, and other brand, the cutter blade
Purchase: bolts (goals / non - Standard), order black tea 950000. Locke: 45# steel, specifications: according to the requirements of the drawings, according to the requirements of the processing, the price: the factory according to the order requir
Purchase: gear (transmission parts, machinery spare parts), order quantity 3200 (sub lot delivery, material: 45 steel, specifications: according to the requirements of the drawing processing custom, just the factory according to the order
A large number of procurement: steel axis; products need to be made according to our specifications and requirements of production; pre 20% - 30% of the deposit, with a section of the home delivery, batch delivery. Please have the capacity of a
Purchase the workpiece box, the number of 120000, A3 steel, technical requirements according to the process of production, the price: the factory from the reasonable price and reported that the supply period of 7-8 months, to determine the cooperation rel
Buy stamping 400 and the suppliers according to the processing of drawings, and documentary sent guidance, in the factory inspection; delivery factory near the port or station, 13335512375 batch a knot payment